DESCRIPTION
Neomax® A108 is an elastic waterproof compound, 100% multi-functional acrylic, water-based, 1 component;
Finished layer has an incredible elasticity, flexibility and great ability to
cover cracks, great adhesion on cement and concrete substrates, and excellent hydrolysis and anti-UV protection.
USED
Neomax® A108 can be used as the perfect waterproofing and coating layer for:
Exposed walls;
Exposed roofs, eaves;
Terrace, yard;
Balconies, loggia;
Restrooms;
Swimming pools; water tanks for fire extinguishment.
ADVANTAGES
Easy to work with paint brushes, décor rollers or professional sprayers;
Good adhesion to mortar and concrete substrates;
The finished layer forms a seamless membrane without joints or cracks;
Exellent elasticity and flexibility;
Incredible crack-bridging properties to cover the substrates;
Excellent hydrolysis and anti-UV protection;
Non-toxic if being completely dry;
Suitable for both vertical and horizontal surfaces;
Excellent dust resistance;
Suitable for outside surfaces;
PRODUCT FEATURES
State: Liquid;
Color: Gray, white or per customer’s requirement.
PACKING:
05 kg/bucket;
20 kg/bucket;
Or per customer's specific request.
STORAGE CONDITIONS
Store the product in a dry, cool and well ventilated area;
Do not expose to direct light.
SHELF LIFE: 12 months since the production date.
CONSUMPTION:
0.15 - 0.2 kg/m2/layer;
At least 2 - 3 layers are required.
WORKING TEMPERATURE: 10°C - 35°C.
PRODUCTION STANDARD: TCCS 18:2018/NEOMAX
Working time: ≤ 30 minutes
Tack free timee: 1 - 2 hours
Complete curing time: ≥ 12 hours
Crack-bridging ability under standard conditions (BS EN 14891:2007): ≥ 0.75 mm
Tensile strength (ASTM D412): ≥ 4.0 MPa
Elongation at break (ASTM D412): 100 ± 10 %
Adhesion on M30 concrete surface (ASTM D4541) : ≥ 1.0 MPa
Shore hardness A (ASTM D2240): 70 ± 10
Water durability after 7 days (TCVN 8653-2 : 2012) : No effect
Durability in NaOH 5% solution after 7 days (TCVN 8653-3 : 2012) : No effect
Notes: All above technical properties are tested in the standard experiment conditions with temperature of 25oC and moisture of 50%. All tested samples are at the age of 28 days.
SURFACE PREPARATION
The working surface must be clean and free from oil, grease and impurities. The surface must be dry and free from standing water.
WORKING
Thoroughly stir the product after opening the bucket.
Use decor rollers or specialized sprayers;
Working consumption: 0.15 - 0.2 kg/m2/layer;
At least 2 - 3 layers are required. Working interval between 2 layers is no less than 20 - 30 minutes. Allow the final coating layer to be completely dry for 12 hours before applying the outer finishing layers, if any;
Working time is about 30 minutes at the temperature of 25 ± 2°C.
NOTE
Prevent any contact with water for 3 hours immediately after application;
Do not mix solvent into the product.